Intelligent substation adaptive network pilot project
The project was completed by the cooperation of State Grid Zhejiang Electric Power Company, State Grid Beijing Economic and Technological Research Institute, North China Electric Power University, Chenxiao Technology Company and Sifang Relay Company. Among them, communication technology and product development are handled by Chenxiao Technology.
This project proposes a new generation of intelligent substation network communication and time synchronization architecture, breaks through key technologies, develops prototype system prototypes, and conducts pilot verification to solve many problems in intelligent substation communication and time synchronization systems, and realizes device plug and play and The network is measurable, visual, manageable and controllable, effectively improving network performance and improving operation and maintenance management capabilities.